Suzhou Honbest Ultra Clean Technology Co., Ltd.

Intelligent Storage · End-to-End Solutions

20 Years of Experience · Serving Customers Worldwide

Chemical Industry Projects
Xinjiang Coal Chemical High-Bay Warehouse Equipment Project
Source: Honbest. Time: 2026-08-22

Project Background

The project, the first phase of which involves the design, production, installation and system integration of 200,000 tons of engineering equipment for the lower-downstream stereobank. The project, when completed, will substantially increase the level of automation and turnover efficiency of the enterprise’s finished-goods warehouses to meet the needs of large-scale, continuous production.

Project live shot: upper stereo shelf and automated delivery system

Project Overview

The project covers full process automation from finished products downline, automatic weighing, labelling, and transport of sorted-to-stereotype storage, supported by the WCS dispatch system and the WMS warehouse management system, to digitize and intelligently manage the finished warehouse. The system can operate independently, or connect to enterprise ERP, MES systems, and build production-storage integrated intelligence shut-down loops.

Equipment component

The project consists of a complete downstream stereobank set of equipment covering a full range of products such as access equipment, shelf systems, delivery equipment, packaging equipment, control systems and warehousing management software.

Automatic stacker cranes Top shelf Transmission system Heavy System Poster Membrane machine Raiser Label Printer Ringing system Stacker. Autojet Automatic stacking/dismantling machines Sweepers. Control system WCS Movement Control System WMS Warehouse Management System
Project live shoots: stacker cranes and automated transmission lines

Project Layout

The project is designed to customize the structure of the client plant and the production process, to rationalize the layout of the automated high-bay warehouse area and the packaging delivery area, and to achieve a smooth flow of the finished product from the lower-package line to the auto-entry library. The following is the layout of the CAD plane:

Project CAD plane layout: 3D reservoir and packaging delivery area planning

Key Project Data

18000+
Position of the finished goods warehouse (16840+1248)
100+ Trail/ Hour
Database efficiency
200+ Trail/ Hour
Treasury efficiency

Project Results

Following the completion of the project, the enterprise ' s finished warehouse was automated with a full process, with a significant reduction in manual warehouse and handling inputs and a significant increase in the utilization of storage space. The WMS warehouse management system resulted in real-time updating of inventory data, batch retroactive and validity alerts, the WCS system guaranteed efficient and synergistic operation of equipment and significantly improved overall warehousing liquidity efficiency, providing robust warehousing guarantees for large-scale, continuous enterprise production.

Get a Tailored Solution for a Similar Project

We can be contacted for free on-site surveying and programme design services if we need to understand the solutions of the coal industry and the chemical industry ' s intelligent stereo storage.

Service coverage: free on-site surveys Custom programme design Full equipment delivery Long-term transportation security